

Support Cbrs B48 Indoor CPE 5g Highspeed Routerw with WiFi 6, WiFi 6e
Basic Info
Model NO. | HIR300 |
Application | Enterprise, SOHO |
Network | 5g |
Performance | Line-Rate Router |
Architecture | Multi Bus Mmulti CPU |
Transport Package | Box |
Specification | 93.5x93.5x172.5mm |
Trademark | Head Weblink |
Origin | China |
Production Capacity | 10000PCS/Month |
Product Description
Support CBRS B48 Indoor CPE 5G highspeed Routerw with WiFi 6, WIFI 6e
5G NR Sub-6GHz:
- MIMO 4*4, 256QAM
- Sub-6G SA 4.2Gbps/900Mbps (DL/UL)
- Sub-6G NSA 5.0Gbps/650Mbps (DL/UL)
5G NR/LTE -> WiFi : up to 1.7Gbps
Software
Operating Temperature:0ºC~40ºC
Storage Temperature :-20ºC~65ºC
Humidity:5%~95%, non-condensing
Power Supply:Input power DC 12V/ 2A
Environment Requirement
5G / 4G;
Ethernet;
5GHz optimization;
SMS;
Firewall;
MAC address Filtering;
WiFi encryption authentication/WPS;
IPv4/ IPv6 and IPv4v6 dual stack support;
Multi WWAN;
WAN/LAN configuration support;
VPN client service (L2TP, PPTP) ;
TR-069 services(Option);
WebUI;
Item | Description |
Chip Platform | Qualcomm SDX55 + WIFI 6 |
LTE Standard | 3GPP Release 10/11 CAT6 |
RAM | 1Gb |
Interface | 1* Gigabit RJ45 WAN,1* Gigabit RJ45 LAN Ethernet |
SIM Card | 1 SIM CARD SLOT |
Datarate | 5G NR Sub-6GHz: - MIMO 4*4, 256QAM - Sub-6G SA 4.2Gbps/900Mbps (DL/UL) - Sub-6G NSA 5.0Gbps/650Mbps (DL/UL) 5G NR/LTE -> WiFi : up to 1.7Gbps |
Power Supply | DC 12V/1A |
Power Consumption | <10W |
Weight | <500g |
Dimensions | 93.5x93.5x172.5mm |
Frequency Bands | 5G NR Sub-6GHz, Rel15 SA and NSA • Band Selection1 5G NR: n1/n3/n5/n7/n8/n20/n28/n38/n40/n41/n77/n78/n79 LTE-FDD: B1/B3/B5/B7/B8/B18/B19/B20/B26/B28/B32 LTE-TDD: B34/B38/B39/B40/B41/B42 WCDMA: B1/B3/B5/B6/B8/B19 Band Selection2 5GNR: n2/n5/n7/n12/n25/n41/n48/n66/n71/n77/n78 LTE-FDD: B2/B4/B5/B12/B13/B14/B25/B26/B29/B30/B41/B66/B71/B41 LTE-TDD: B41/B48 WCDMA: B2/B4/B5 WLAN: IEEE 802.11a/b/g/n/ac/ax WLAN: Built-in 2*2+2*2 MIMO |
Packaging & Shipping
All items are well packed according to the requirement. Packing can be done as per customer's requirement. Production Lead-time : 2-6 weeks |
CE Certification
Company Information